The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates.Table: Basic Data Review for Construction Project Equipment ArrangementCycle Time (hours)Step Description Actual Potential Difference1Read basic data package44—2Write, type, proof, sign, copy, and distribute cover letter21.90.521.43Queue400404Lead engineer calls key people to schedule meeting40.253.755Write, type, proof, sign, copy, and distribute confirmation letter25.42.123.36Hold meeting; develop path forward and concerns44—7Project leader and specialist develop missing information1212—8Determine plant preferred vendors1212—9Review notes from meeting1212—10Resolve open issues106104211Write, type, proof, sign, copy, and distribute basic data acceptance letter26.50.2526.25Totals267.8151.1116.7Use the data in the table above and answer the following questions in the space provided below:1. What are the sources of value-added and non-value-added work in this process?2. Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use?3. Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it?4. What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one?
The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review
MAT 510 – Homework Assignment Homework Assignment 3 Due in Week 3 and worth 30 points The following data consists of the actual time used and potential (the best time possible for this review process) to complete each step in the review process. The actual times are based on the review of 30 projects. The potential times are subjective engineering judgment estimates. Table: Basic Data Review for Construction Project Equipment Arrangement Cycle Time (hours) Step Description Actual Potential Difference Read basic data package — Write, type, proof, sign, copy, and distribute cover letter 21.9 0.5 21.4 Queue 40 40 Lead engineer calls key people to schedule meeting 0.25 3.75 Write, type, proof, sign, copy, and distribute confirmation letter 25.4 2.1 23.3 Hold meeting; develop path forward and concerns — Project leader and specialist develop missing information 12 12 — Determine plant preferred vendors 12 12 — Review notes from meeting 12 12 — 10 Resolve open issues 106 104 11 Write, type, proof, sign, copy, and distribute basic data acceptance letter 26.5 0.25 26.25 Totals 267.8 151.1 116.7 Use the data in the table above and answer the following questions in the space provided below: What are the sources of value-added and non-value-added work in this process? Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use? Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it? What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one? Type your answers below and submit this file in Week 3 of the online course shell:
Why Choose Us
- 100% non-plagiarized Papers
- 24/7 /365 Service Available
- Affordable Prices
- Any Paper, Urgency, and Subject
- Will complete your papers in 6 hours
- On-time Delivery
- Money-back and Privacy guarantees
- Unlimited Amendments upon request
- Satisfaction guarantee
How it Works
- Click on the “Place Order” tab at the top menu or “Order Now” icon at the bottom and a new page will appear with an order form to be filled.
- Fill in your paper’s requirements in the "PAPER DETAILS" section.
- Fill in your paper’s academic level, deadline, and the required number of pages from the drop-down menus.
- Click “CREATE ACCOUNT & SIGN IN” to enter your registration details and get an account with us for record-keeping and then, click on “PROCEED TO CHECKOUT” at the bottom of the page.
- From there, the payment sections will show, follow the guided payment process and your order will be available for our writing team to work on it.